From the study to the first bill with self-consumption

  1. Viability. We review consumption, location, proximity, surface area and electrical configuration.
  2. Design and agreements. Participants, teams, modality, distribution and contracts are specified. When applicable, the agreement of the community or the title of use of the cover is obtained.
  3. Permits and technical documentation. A project or report is prepared, access and connection permits are checked and municipal titles, authorizations and applicable regional requirements are processed.
  4. Installation and legalization. The execution is carried out by qualified professionals. Its commissioning is documented and the corresponding communications or registrations are processed.
  5. Supply association. The distribution agreement and consistent data of the facility and each consumer are communicated, and the necessary contracts are adapted.
  6. Activation and verification. The status of each CUPS, the effective date and the application of the measures on the first invoices are verified.

Regulatory basis: Royal Decree 244/2019, articles 6 to 12 and 19 to 21, Royal Decree 1183/2020 and REBT, ITC-BT-04 and ITC-BT-40.